Privacy education, consultancy & implementation, in 50+ jurisdictions. enquiry@vedhacon.com
Guidance and examples adapt to your selection. ↑↓ to browse, ↵ to apply
Not sure where to start? Check your readiness in 10 minutes

Eighteen questions, eight domains, a prioritised list of gaps. Nothing leaves your browser.

Begin the assessment
Featured jurisdiction India, DPDP Act 2023

Notice, consent, Data Fiduciary duties, SDF obligations and breach intimation, explained.

Open the guide
Where most engagements start A readiness assessment, then a plan

We scope against the laws that actually apply to you, then sequence the work by risk.

Start the assessment
Free, no sign-up Check your readiness in 10 minutes

Answer 18 questions and get a prioritised control roadmap instantly.

Start the assessment
Free, always Zero to practitioner

Track 01 assumes no prior knowledge of governance, risk and compliance.

Start Track 01
India · live implementation briefing

The DPDP implementation clock is running

India’s phased commencement is no longer an abstract horizon. Track the next statutory milestone in real time, see what applies when, and turn the remaining window into a controlled programme with evidence.

Reviewed 9 October 2026 · 10 minute read · General guidance, not legal advice

● Live statutory countdown

Time to the next milestone

Calculating from your device date…

-- Days
-- Hours
-- Minutes
-- Seconds

Calculating programme elapsed time…

01 · statutory position

Three phases, two dates still shaping the programme

The commencement notification dated 13 November 2025 ties each phase to publication in the Official Gazette. The Gazette record carries 14 November 2025, so the one-year and eighteen-month milestones fall on 14 November 2026 and 14 May 2027.

Phase 1

Framework and Board provisions

Definitions and provisions establishing the Data Protection Board, its composition, powers, procedure and related machinery commenced on publication.

Phase 2

Consent Manager provisions

Section 6(9) and section 27(1)(d) commence: the consent-giving framework through registered Consent Managers and the connected Board function become operative.

Phase 3

Core duties and rights

Notice, consent, legitimate uses, Data Fiduciary duties, security, breach intimation, erasure, children’s data, rights, Significant Data Fiduciary duties and remaining provisions commence.

02 · implementation system

Build six connected workstreams, not six isolated documents

A defensible programme connects each obligation to a process owner, system control, operating record and review cycle. Controls should be tested before commencement, not merely approved.

Privacy office + business

1. Scope, inventory and grounds

  • Confirm territorial applicability, roles and entities.
  • Reconcile processing, systems, processors and data flows.
  • Map each purpose to consent or a section 7 legitimate use.
Legal + product + design

2. Notice and consent

  • Issue standalone, itemised notices in clear language.
  • Make withdrawal as easy as giving consent.
  • Version interfaces and preserve proof of the journey.
Operations + support

3. Rights and grievances

  • Publish an accessible request and grievance route.
  • Verify identity proportionately and route requests to systems.
  • Measure ageing, outcomes, exceptions and escalation.
Security + incident response

4. Safeguards and breach

  • Translate reasonable safeguards into owned technical controls.
  • Define detection, assessment, Board and individual intimation.
  • Run a timed tabletop exercise and close findings.
Data governance + engineering

5. Retention and deletion

  • Set purpose-linked retention rules and legal holds.
  • Implement deletion across production and vendors.
  • Keep execution logs and investigate failed jobs.
Procurement + assurance

6. Processors, children and SDF

  • Re-paper processors and monitor safeguards.
  • Detect children’s use and design verifiable parental consent.
  • Prepare DPO, DPIA and audit capability if SDF designation is plausible.
03 · action now

A practical next 90 days

Prioritise dependencies and long lead times. A late programme should begin with accountable scope and evidence-producing controls, not policy drafting alone.

Days 0–30 · establish truth

Mobilise and baseline

Name the sponsor and owners; confirm applicability; reconcile the inventory; identify children’s data, processors and product releases needing design changes.

Days 31–60 · build journeys

Design and implement

Approve grounds; redesign notice and consent; launch rights routing; define retention and breach decisions; issue processor amendments; create the evidence index.

Days 61–90 · prove operation

Test and remediate

Run request, withdrawal, deletion and breach scenarios; sample consent records; test vendor escalation; train frontline teams; report residual risk to leadership.

04 · interactive diagnostic

Can you prove these controls today?

Tick only what is operating and evidenced, not what is planned. This check is not saved or transmitted.

05 · assurance

The evidence pack leadership should be able to open

Policies describe intent. These artefacts show that privacy controls are designed, deployed and operating.

  1. Applicability decision, governance charter, owners and risk acceptance log.
  2. Processing register, system map, processor register and purpose-to-ground matrix.
  3. Notices, consent language, interface captures, versions and withdrawal records.
  4. Rights procedure, request register, ageing metrics, decisions and correspondence.
  5. Safeguard catalogue, test results, exceptions and remediation evidence.
  6. Breach playbook, decision log, notification templates and exercise report.
  7. Retention schedule, system rules, legal holds, deletion runs and failures.
  8. Processor clauses, due diligence, monitoring and incident escalation.
  9. Children’s-data assessment and parental-consent design where applicable.
  10. SDF readiness: DPO model, DPIA method, audit plan and reporting.
Minimum accountability model
Decision or control Accountable lead Evidence Review trigger
Purpose and ground Business owner with privacy/legal Approved purpose-to-ground register New or changed processing
Consent and notice Product owner Versioned copy, captures, logs and test Release or purpose change
Breach decision Incident commander with privacy/legal Timed decision log and communications Every suspected breach
Deletion Data or system owner Job log, exception queue and closure Scheduled run and request
06 · common questions

What teams ask when the deadline becomes real

When do the main obligations commence?

The principal Data Fiduciary duties and Data Principal rights listed in the notification commence on 14 May 2027.

What changes on 14 November 2026?

Section 6(9) and the connected Board function in section 27(1)(d), concerning Consent Managers, commence.

Is this a grace period?

It is a build window. System changes, vendor negotiation, training and test evidence need to be ready before duties commence.

Do processors have direct duties?

The Act places primary obligations on the Data Fiduciary, which remains responsible for processing on its behalf; contracts and oversight are central controls.

Should we wait for SDF designation?

No. Build proportionate DPIA, audit, DPO and governance capability, but do not state that designation is certain until notified.

Does this replace legal advice?

No. Confirm the current Act, Rules, notifications and Board guidance for your facts.

Last reviewed 9 October 2026. The clock uses the visitor’s device time and advances automatically between milestones.

Move from deadline to evidence

Build a DPDP programme that can survive testing